eNewsletter for May 20, 2013


Your experience confirms what I had heard that what was behind the fee and reservations on bikes on the Surfliners were because of problems running on-time with the low-level equipment and problems loading and unloading bikes on the Cab/Baggage Car. The Surfliners only have one low-level trainset but it is a major cause of Surfliners being late and is preventing running times being reduced on the the Surfliners. There is a simple solution to this problem. Metrolink is now storing many of its older cars that have been replaced by newer cars. These can be leased and added to low-level equipment trainsets. One or two to theses bi-level cars added to low level train sets will speed up loading and unloading of these train sets at stations. Metrolink has already converted some of these cars as bike cars by pulling out some seats on the lower level. Not only bikes but luggage could be stored on such cars reducing the hassle of using the Cab/Baggage Cars. Also these bi-level cars are easier to use for people with disabilities and have handicap toilets. They also allow groups to sit together facing each other with tables which is very popular with passengers and not available on the low-level equipment. NB

May 20, 2013 Part 1  May 20, 2013 Part 2  May 20, 2013 Part 3

The above copy of this enewletter is on a PDF file and you will not be able to click on to the links in blue. If you would like to subscribe to this enewsletter write to [email protected] above copy of this enewletter is on a PDF file and you will not be able to click on to the links in blue. If you would like to subscribe to this enewsletter write to [email protected]