-
eNewsletter for June 3, 2013
Here is a quote from the motion LA Metro Chair Supervisor Antonovich made on this issue of expanding Metrolink service. Since Los Angeles County has 40 percent of the votes on the Metrolink board and Supervisor Antonovich is also on the Metrolink (SCRRA) Board, it sounds like he means business. NB “Furthermore, in contrast to…
-
eNewsletter for May 28, 2013
Metrolink: Raise Ridership Not Fares for More Revenue There is no mystery how to increase rail passenger revenue. Train revenue increases with longer routes serving as many markets as possible by selling more of the highest priced and longest distance tickets. The next best thing are good connections with other trains and connecting buses to…
-
eNewsletter for May 20, 2013
Your experience confirms what I had heard that what was behind the fee and reservations on bikes on the Surfliners were because of problems running on-time with the low-level equipment and problems loading and unloading bikes on the Cab/Baggage Car. The Surfliners only have one low-level trainset but it is a major cause of Surfliners…
-
eNewsletter for May 13, 2013
Amtrak’s Pacific Surfliner Adopts Wildly Anti-Bicycle Policy Streetsblog Los Angeles (blog)-May 7, 2013 Starting on June 1, the Amtrak Pacific Surfliner service connecting San Luis Obispo to San Diego by way of Los Angeles is adopting a new policy that will make life harder for anyone planning on biking to or from the train. The policy is…
-
eNewsletter for May 6, 2013
Draft alternatives released for Los Angeles Union Station Master Plan The Los Angeles Union Station Master Plan team is releasing its draft alternatives today for improving the venerable station as a transit center. Among some of the proposals are replacing the parking lots in front of the station with open space, building a new bus…
-
eNewsletter for April 29, 2013
I have 34 years of experience as a rail passenger service advocate in California which has been the leader for rail passenger service expansion now for almost 40 years. I have seen and in many cases been involved in what works and have seen what doesn’t work to get more and better rail passenger service.…
-
eNewsletter for April 22, 2013
AMTRAK’S NEW COST ACCOUNTING SYSTEM IS A SIGNIFICANT IMPROVEMENT BUT CONCERNS OVER PRECISION AND LONG TERM VIABILITY REMAIN In 2010, Amtrak implemented its new system, Amtrak’s Performance Tracking (APT), which is based on a cost methodology developed jointly by FRA and Amtrak, to track and report on its financial performance… Amtrak is unable to assign a…
-
eNewsletter for April 15, 2013
It is amazing that the mechanics and the NCTD engineer in charge of Sprinter maintenance knew only a year after the start of Sprinter service that there was a problem with these rotors, but not management. In 2009 this engineer was contacting manufacturers about replacement rotors and it was 3 years before he got a…
-
eNewsletter for April 8, 2013
The western trains ALL cover their variable and direct fixed costs of operations handily, but fail only to cover Amtrak’s allocations of system fixed costs which exist irrespective of the fact or volume of long distance train operations. It is still the case also that Amtrak deliberately misallocates substantial shares of NEC fixed costs to…
-
eNewsletter for April 1, 2013
U.S. Report Backs Bullet Train Revenue Forecasts Los Angeles Times Mar 29, 2013 The GAO study says that the project’s ridership and revenue forecasts are reasonable but it renews concerns about future funding. The lesson from this is you may not like what your asked for. The GAO admits that the current Cal HSR project…