By Noel T. Braymer Everything was normal until we left the City of Commerce station on Metrolink #604 after leaving LAUS on time at 4:30 PM on Friday September 20, 2013. We barely cleared the station around 4:45 PM when we came to a halt. That’s not usual if the problem was signals or a…
From David B. Kutroksy, Managing Director Capitol Corridor Joint Powers Authority Capitol Corridor Service Performance After a bounce in ridership in July 2013, ridership dropped in August 2013 by 2.2% compared to August 2012. A total of 143,080 passengers rode Capitol Corridor trains in August. Initial evaluation of conductor counts indicated that ridership for August…
By Noel T. Braymer In 1998 the future of rail transit, particularly subway construction looked bleak in Los Angeles. Construction of the Red Line subway from downtown Los Angeles to North Hollywood was a mess. The Red Line construction had created a huge sink hole in east Hollywood. Many buildings were damaged because of ground…
By Noel T. Braymer LOSSAN’s goal should be to increase ridership by providing better rail passenger service with faster trains serving more destinations.This is done with coordination of the different services to feed both local and express trains. By doing so all the trains on LOSSAN will improve their efficiency and be more economical for…
By Noel T. Braymer LOSSAN originally stood for LOS Angeles-SAN Diego for the route of the San Diegan Trains back in the 1980’s. Since then rail service on this corridor has expanded to Santa Barbara and later to San Luis Obispo. With the introduction of Metrolink and Coaster service sharing parts of the LOSSAN corridor…
Here are 5 photos by RailPAC photographers. Click on each photo to see it full size! Contributions to this page are welcome. Send your jpg rail photos to RailPAC Photo Editor, at [email protected]. 1. RailPAC President Paul Dyson presented a plaque of appreciation to Jacki Bacharach for all her support for passenger rail in her…