Home News Archive eNewsletter eNewsletter for March 5, 2012
eNewsletter

eNewsletter for March 5, 2012

Share
Share

Express train 599 is suppose to run from San Diego to Los Angeles in 2 hours and 28 minutes with 4 intermediate stops. The first Amtrak train out of San Diego the 763 is scheduled to get to Los Angeles in 2 hours 40 minutes with 7 intermediate stops. What is really pathetic is that back in 1978 the Amtrak schedule between San Diego and Los Angeles was 2 hours and 35 minutes with 5 intermediate stops. That was without push-pull equipment, well over a billion dollars in track improvements since 1978 or Surfliner cars with low-level loading and wide power operated doors for fast loading and unloading.

March 5, 2012

The above copy of this enewletter is on a PDF file and  you will not be able to click on to the links in blue. If you would like an emailed copy of this enewsletter or to subscribe to it email nbraymer@xg1.b3e.myftpupload.com

Posts by Category

Posts by Year

Related Articles
Newswire

Wisconsin Wins $218 Million Grant To Extend Hiawatha To Madison

A proposal to restore passenger rail service between Milwaukee and Madison has...

Newswire

Gilroy to Central Valley Wye Project Signed Notice of Preparation

The California High-Speed Rail Authority (Authority), as the Lead Agency for the...

Newswire

MassDOT Wins More Federal Funds to Build Springfield Amtrak Station Expansion Project

Massachusetts has secured another $130 million in federal funding to build a...

Newswire

North Carolina receives $550 million for S-Line passenger project

RALEIGH, N.C. — The Federal Railroad Administration and North Carolina Department of...